Trisura

Interior build out that included rework for office areas, and meeting rooms, kitchens and entryways while the space was being occupied. Project scope included demolition, mechanical, electrical, millwork, communications & IT.

Omers Project One

Interior build out of floors 9-25, to co-locate entire OMERS team at one location. This included a structural staircase from executive floors 20-22.

Fidelity

Fidelity Facilities Refresh. Implementation of new national standards for office construction and technology standards.

KingSett Capital

Build out of new offices occupying two floors, consisting a structural staircase connecting the floors, lobbies, reception area, mix of private & open offices, large boardroom, copy stations, catering kitchen complete with appliances and lunchroom. Specialty and luxurious finishes were installed throughout the space, including glass, wood and polished marble floors as well as sound […]

Oxford WIC

Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s.

Cormark Securities

New office, consisting of a single floor build out including reception and elevator lobby with specialty wood and glazing throughout. Scope included Electrical and ICAT components.

Pure Fitness

The project consisted of building an Athletic Facility approx. 30,063 SFT. The scope of work included building a full gym, swimming pool, hot yoga room, sauna, with locker rooms and washrooms. Project required structural steelwork, millwork, glazing, a mix of flooring re wood and carpet, new mechanical, sprinkler, electrical, security, with new doors/ frames throughout.